Location: Eslöv, Sweden
For the construction of Lidl’s new store in Eslöv, we were responsible for a comprehensive electrical contracting project focused on modern technology, operational reliability, and strict energy efficiency. The project encompassed everything from power and lighting installations in the sales floor and warehouse to advanced control and regulation systems, as well as integrated emergency lighting.
Retail chains like Lidl place extremely high demands on short construction timelines and precise logistics. Through well-structured project management and close collaboration with the general contractor, we managed to maintain a fast pace without compromising on quality. The focus was on installing smart, energy-saving LED systems and adapting the electrical infrastructure to sustain the heavy demands of refrigeration and freezer technology in a sustainable manner.
The result was a state-of-the-art, energy-efficient grocery store that meets all of Lidl’s stringent environmental and operational requirements. Thanks to thorough inspections and a smooth handover, the store was able to open exactly as planned, ready to welcome the residents of Eslöv to a safe and well-lit shopping destination.